Demand Driven Material Requirements Planning (Ddmrp), Version 3

Demand Driven Material Requirements Planning (Ddmrp), Version 3 - Carol Ptak

Demand Driven Material Requirements Planning (Ddmrp), Version 3


In the 1950s, a method called Material Requirements Planning (or "MRP") changed the world of manufacturing forever. But times have changed--customer tolerance times are shorter, product variety and complexity has increased, and supply chains have spread around the world. MRP is dramatically failing in this "New Normal."
Demand Driven Material Requirements Planning (DDMRP), Version 3 presents a practical, proven, and emerging method for supply chain planning and execution that effectively brings the 1950s concept into the modern era. The foundation of DDMRP is based upon the connection between the creation, protection, and acceleration of the flow of relevant materials and information to drive returns on asset performance in the New Normal.

Using an innovative multi-echelon "Position, Protect and Pull" approach, DDMRP helps plan and manage inventories and materials in today's more complex supply scenarios, with attention being paid to ownership, the market, engineering, sales, and the supply base. It enables a company to decouple forecast error from supply order generation and build in line to actual market requirements, and promotes better and quicker decisions and actions at the planning and execution level. DDMRP is already in use by MAJOR Global 1000 companies. This book is THE definitive work on DDMRP, and will be required as courseware for all those taking the Certified Demand Driven Planner (CDDP) Program.

New Features in Version 3

  • Full color, with the use in specific, consistent, and focused ways to clearly and effectively highlight planning, execution, and model reconfiguration priorities.
  • Expanded Appendix E, looking at the most recent innovations of DDMRP.
  • Revised graphics scattered throughout the book.
Citeste mai mult

-10%

transport gratuit

PRP: 852.27 Lei

!

Acesta este Pretul Recomandat de Producator. Pretul de vanzare al produsului este afisat mai jos.

767.04Lei

767.04Lei

852.27 Lei

Primesti 767 puncte

Important icon msg

Primesti puncte de fidelitate dupa fiecare comanda! 100 puncte de fidelitate reprezinta 1 leu. Foloseste-le la viitoarele achizitii!

Livrare in 2-4 saptamani

Plaseaza rapid comanda

Important icon msg

Completeaza mai jos numarul tau de telefon

Poti comanda acest produs introducand numarul tau de telefon. Vei fi apelat de un operator Libris.ro in cele mai scurt timp pentru prealuarea datelor necesare.

Descrierea produsului


In the 1950s, a method called Material Requirements Planning (or "MRP") changed the world of manufacturing forever. But times have changed--customer tolerance times are shorter, product variety and complexity has increased, and supply chains have spread around the world. MRP is dramatically failing in this "New Normal."
Demand Driven Material Requirements Planning (DDMRP), Version 3 presents a practical, proven, and emerging method for supply chain planning and execution that effectively brings the 1950s concept into the modern era. The foundation of DDMRP is based upon the connection between the creation, protection, and acceleration of the flow of relevant materials and information to drive returns on asset performance in the New Normal.

Using an innovative multi-echelon "Position, Protect and Pull" approach, DDMRP helps plan and manage inventories and materials in today's more complex supply scenarios, with attention being paid to ownership, the market, engineering, sales, and the supply base. It enables a company to decouple forecast error from supply order generation and build in line to actual market requirements, and promotes better and quicker decisions and actions at the planning and execution level. DDMRP is already in use by MAJOR Global 1000 companies. This book is THE definitive work on DDMRP, and will be required as courseware for all those taking the Certified Demand Driven Planner (CDDP) Program.

New Features in Version 3

  • Full color, with the use in specific, consistent, and focused ways to clearly and effectively highlight planning, execution, and model reconfiguration priorities.
  • Expanded Appendix E, looking at the most recent innovations of DDMRP.
  • Revised graphics scattered throughout the book.
Citeste mai mult

De pe acelasi raft

Parerea ta e inspiratie pentru comunitatea Libris!

Noi suntem despre carti, si la fel este si

Newsletter-ul nostru.

Aboneaza-te la vestile literare si primesti un cupon de -10% pentru viitoarea ta comanda!

*Reducerea aplicata prin cupon nu se cumuleaza, ci se aplica reducerea cea mai mare.

Ma abonez image one
Ma abonez image one